| Baseline reproduction |
failed_as_expected |
Both targeted provenance/promotion regression cases failed against production3513da2:2 failed,7 deselected in1.20s. |
| Focused regression |
passed |
81 passed in12.69s, covering continuous engine, promotion transactions and nine new retirement/provenance cases. |
| Final focused regression |
passed |
85 passed in11.41s, including all preactivation retry states, rejected outcomes, newer transaction protection, idempotence and canonical tick ordering. |
| Initial qualification setup |
failed_then_corrected |
First three scenario groups passed; runtime isolation group had1 failed and5 passed because the isolated checkout lacked the pinned Python runtime path. Linked the existing Python environment and started a fresh final-revision qualification. |
| Live cleanup |
passed |
Exactly one terminally failed promotion idea retired under the controller lease after a SQLite backup. Repeated cleanup changed nothing; attempt counts and historical events preserved. |
| Final restricted repository suite |
passed |
1066 passed,11 skipped,18 warnings in478.41s using WSL/Bubblewrap on final revisione2b25b0. Earlier development run also passed1062 tests with11 skipped; final run is release evidence. |
| Exact revision pipeline qualification |
passed |
All5 required groups passed for e2b25b0: candidate evaluation, promotion and rollback, autonomous recovery, runtime isolation/state and assistant product path. |
| Deployment identity |
passed |
Backed up queue state, fast-forwarded the clean production checkout through the guarded maintenance integration, copied the verified qualification packet and launched Hiro through the existing helper. PID11232 loaded e2b25b0, matching checkout; health ok and Qwen connected. |
| Public journal |
passed |
npm run test:hiro and npm run build passed, including225 generated entry checks; rerun after final evidence update. |