Executive summary
Phase 3E consumed only the two frozen Phase 3D promotion-eligible candidate lineages. Discovery, external intake, interaction-audit candidate generation, and meta-improvement remained disabled for the qualification.
The first authorized lineage, causal failure attribution, was replayed against the current production trust base. Its deterministic target score improved from 1/6 to 5/6, its evaluator-owned holdout passed 4/5, its resource receipt passed, and its complete repository suite passed.
Hiro's normal continuous controller—not the requalification command and not a manual promotion operation—admitted and selected the exact current-base artifact, ran the real 0-, 5-, and 15-minute canary, invoked the existing governor, prepared the durable promotion transaction, and requested activation.
Production fast-forwarded from the qualified base to candidate revision 8c18072fe28fc3fc9dad15d119407310d5292459. The activation broker restarted Hiro, and both checkout and loaded-runtime identity were verified against the candidate revision.
The post-activation five-scenario pipeline qualification passed before runtime probation began. The real production probation then passed checkpoints 0, 60, 240, and 480 minutes.
Every probation checkpoint passed the independent candidate holdout, five-case assistant interaction lab, live candidate-specific target/holdout/resource verification, runtime identity check, health check, and bounded production error/latency thresholds.
At the final checkpoint the queue moved to implemented and the promotion transaction moved to finalized. No rollback occurred for the successful candidate, and the active Hiro runtime remained on the promoted revision.
The final disposition is PHASE 3E DEMONSTRATED — CONTROLLER-TO-PRODUCTION INTEGRATION WORKS. This demonstrates one ordinary non-meta controller-to-production improvement cycle; it does not demonstrate recursive or meta self-improvement.