Executive summary
Qualified the first upstream controller layer against the already-proven production promotion actuator, using one deliberately trivial real Hiro observability change rather than a synthetic promotion object.
The final candidate added one redacted raw-model-output length field to response-envelope logs and one targeted baseline-contrast test. It traversed normal investigation, model-driven construction, evaluation, independent canary, full-suite governor, real activation, runtime verification, four probation checkpoints, and finalization.
The final governor run passed 790 tests. The live service reports the promoted revision as both loaded and checked out, and the canonical queue finished implemented while the promotion transaction finished finalized.
First-divergence discipline exposed and repaired narrow upstream problems: ambiguous evidence classification, qualification-environment configuration, external-runner activation reconciliation, and a repeatable insert-before edit-shape defect that duplicated a preserved anchor.
Two deliberately bad candidate attempts were correctly rejected at the first independent canary after a new duplicate-key invariant was added. No threshold was lowered and no promotion gate was bypassed.
Phase 2 was not started. The measured full governor suite takes about eight minutes and a complete real promotion takes roughly fifteen to seventeen minutes, so ten distinct clean promotions require at least two and a half hours. Phases 3 and 4 therefore remain gated and unproven.