Executive summary
The promotion pipeline did not stop running after the two supervised successes. The live queue remained active, Qwen 3.8 27B remained healthy at a 16,384-token context window, and the circuit breaker was closed.
After the latest promotion, the queue recorded 22 investigations and 22 confirmed potentials. None reached paired evaluation: 11 were scheduled for another construction attempt and nine exhausted construction attempts as artifact_generation_blocked. One additional obsolete incident was active on its third attempt during inspection.
The common cause is a stale-data scheduling defect. High-priority interaction-audit incidents created before the full-prompt replay repair do not contain the synthetic prompt that holds required facts such as schedule, weather, transit, or conversation context. Their abbreviated user query refers to a supplied snapshot but does not include it. Candidate construction is consequently asked to synthesize required facts from unavailable evidence.
A second queue-policy defect amplifies the problem: artifact-blocked records are automatically reactivated whenever the active repository revision changes. The successful promotion changed the revision, so the scheduler began draining obsolete pre-fix incidents ahead of newer causally complete records. This creates sustained construction churn that looks like a stopped promotion system even though the workers are busy.