Hiro development journal

Continuous improvement idea discovery is live but deliberately narrow

Read-only diagnosis completed; no Hiro behavior changed Machine-readable JSON

Executive summary

Hiro's active improvement coordinator is connected to the long-lived scheduler and is checked once per minute.

A completed first cycle is recorded at 07:53 Pacific time. It completed normally but produced zero improvement specifications and zero candidates.

The current proposal generator derives actionable ideas mainly from public evaluation failures and a small set of predefined response-envelope patterns, including timeouts, blocked grounding, selected server errors, and slow factual requests.

The coordinator also watches server-log and metacognition changes when deciding whether to wake, but the current proposal generator does not directly convert those two evidence streams into improvement specifications.

Curiosity questions are generated from observed usage patterns, but they do not currently enter autonomous candidate construction unless they are first converted into a code-changing improvement specification.

Work completed

Scheduler and cadence trace

Connected and active
  • The long-lived scheduler invokes the evidence-driven improvement due-check once per minute.
  • A changed evidence fingerprint can start a cycle after a 30-minute minimum interval.
  • If evidence remains unchanged, an idle-discovery cycle becomes due after four hours.
  • Legacy automatic Daylab, Nightlab, and internet-observation schedules remain disabled.

Idea-source trace

Working within a limited rule set
  • Each proposal-only cycle can harvest public benchmark failures and translate a qualifying failure signal into an improvement specification.
  • Recent response envelopes are inspected for predefined patterns: web-search timeouts, grounding-related blocks, selected HTTP errors, and high-latency factual requests.
  • The curiosity pass asks broader questions about slow tool paths, missing resolvers, user satisfaction, capability gaps, and proactive partnership.
  • Lightweight regression probes provide an additional source of measured evidence.
  • No public-internet research or unrestricted model-led brainstorming is part of this automatic discovery path.

Downstream candidate path

Available when a qualifying specification exists
  • Only code-changing improvement specifications are handed to autonomous candidate construction.
  • Candidates are built in external worktrees and must pass public evaluation, held-out evaluation, regression, invariant, and latency checks before isolated integration can proceed.
  • Stage 5 handles isolated integration and reporting; Stage 6 separately controls any active-branch promotion.
  • Stage 6C observes and validates promoted behavior downstream. It is not itself a source of improvement ideas.

Decisions and reasoning

Validation and evidence

CheckStatusResult
Scheduler connection passed by source inspection The recurring scheduler creates an active-improvement due-check task and sleeps for 60 seconds between iterations.
Active policy passed by source inspection The active policy is enabled with a 60-second poll, 30-minute minimum cycle interval, and four-hour maximum idle-discovery interval.
First live cycle record completed with no candidates The frozen state records a completed first cycle at 07:53 Pacific time with zero specifications, zero candidates, and a no-candidates sandbox result.
Idea-generation inputs partially connected Public evaluation and response-envelope patterns can create specifications. Server-log and metacognition changes affect the wake-up fingerprint but are not directly consumed by the active specification generator.
Hiro tests not run This session performed read-only source and runtime-state inspection. No Hiro files changed, so no Hiro test claim is made.
Journal test suite passed The required timestamped-entry journal tests completed successfully.
Journal production build passed The required journal generation, output validation, TypeScript compilation, and production build completed successfully for 100 entries.

Current state

Next steps