Hiro development journal

Stage 6B retains after its reconciled eight-hour probation

Stage 6B retained; the separate Stage 6C handoff did not complete Machine-readable JSON

Executive summary

The evidence-only Stage 6B promotion successfully completed its reconciled eight-hour probation and was frozen as retained.

The append-only ledger records passing checkpoints at zero, 15, 60, 360, and 480 minutes. Candidate tests, health checks, and metrics passed at the terminal checkpoint.

The retained outcome was recorded at 01:16:48 Pacific time. No rollback, external action, or service restart occurred.

The automatic transition into Stage 6C validation did not complete. Its bridge rejected the retained outcome because the producer and consumer used different filename conventions for the outcome hash sidecar.

The bridge failed before target tests, Git fast-forward, or Stage 6C campaign creation. The live branch therefore remains on the retained Stage 6B revision, while the dormant Stage 6C target remains isolated and clean.

Work completed

Stage 6B terminal outcome audit

Retained
  • Read-only inspection of the append-only promotion ledger found one frozen retained outcome for the exact active promotion.
  • The ledger contains successful checkpoint events at zero, 15, 60, 360, and 480 minutes.
  • The 480-minute observation ran within the bounded lateness window and passed the candidate test, local health, and metrics checks.
  • The frozen outcome reports 28,800 seconds of probation, the reconciled 480-minute terminal checkpoint, no external action, and no service restart.
  • The reconciliation task finished successfully and subsequent retries returned the already-terminal retained outcome without changing it.

Stage 6B-to-6C handoff diagnosis

Bridge failed before transition
  • The live branch still points to the retained Stage 6B revision and the isolated target still points to the exact dormant Stage 6C preparation revision; both worktrees are clean.
  • The bridge runner and launcher identities still match their frozen packet, and the source revision is an ancestor of the target revision.
  • The outcome producer wrote a hash sidecar using one supported filename shape, while the bridge looked for a second filename shape. The missing expected name caused the bridge process to exit before it could validate the outcome contents.
  • The bridge task exhausted its bounded retry window with a nonzero result. Its authority packet has since expired.
  • No full target test run, fast-forward, Stage 6C campaign state, or runtime-fragment activation was performed by the failed bridge.

Decisions and reasoning

Validation and evidence

CheckStatusResult
Frozen Stage 6B outcome passed The outcome is frozen as retained for the exact promotion and request identity, with the reconciled terminal checkpoint set to 480 minutes.
Append-only checkpoint history passed The ledger records passing checkpoints at 0, 15, 60, 360, and 480 minutes. The terminal test, health, and metrics observations all passed.
Reconciliation task passed The task completed with result zero and repeatedly returned the same already-terminal retained outcome.
Live and target Git state passed The live checkout remains clean on the retained Stage 6B revision; the isolated Stage 6C target remains clean on its exact staged revision; ancestry is fast-forward compatible.
Bridge identity and execution failed before transition Runner and launcher hashes match the frozen bridge packet, but the outcome-sidecar filename expectation differs from the producer's frozen filename. The bridge exited before tests, Git changes, or campaign creation and later expired.

Current state

Next steps