Hiro development journal

Daylab is evaluating rapidly but no longer advancing Stage 6

Live behavior diagnosed; runtime unchanged Machine-readable JSON

Executive summary

Daylab remains active as a standalone process with a 30-minute interval and a 20-minute per-cycle ceiling.

Each cycle selects an adaptive public evaluation suite, runs isolated evaluation cases, reviews recent response envelopes, generates proposal-only diagnostic artifacts, runs lightweight regression probes, writes a personality journal, and attempts a Telegram completion briefing.

Sixteen cycles completed between 08:32 and 16:02. Together they consumed 252 isolated-model calls, evaluated 252 cases with 13 failures, ran 352 lightweight probes, and emitted 12 ImprovementSpecs covering only five distinct opportunity keys.

The latest cycle ran 16 evaluation cases with a 100 percent pass rate, reread 100 recent envelopes, ran 22 probes, generated no ImprovementSpec, and repeated three generic curiosity questions.

Daylab is proposal-only: code patches and automatic promotion are disabled. Stage 6 is also disabled at the scheduler and runtime-marker levels, and Daylab's one-shot Stage 6 candidate preparation has already been consumed, so current cycles cannot advance or promote a candidate.

The loop is producing valid evaluation telemetry, but its 30-minute cadence is now yielding substantial repeated analysis and notification traffic relative to novel actionable findings. No runtime setting or process was changed during this diagnosis.

Work completed

Live process and cadence inspection

Complete
  • Confirmed the same Daylab process has remained active since the morning restart.
  • Confirmed its command line specifies a 30-minute interval and a 20-minute maximum cycle duration.
  • Observed 16 completed run directories from 08:32 through 16:02, consistent with the configured cadence.

Cycle behavior analysis

Complete
  • Verified Daylab rotates through adaptive evaluation suites and labels every result as a fresh Daylab evaluation.
  • Verified each full cycle also rereads up to 100 recent response envelopes, derives bounded proposals and curiosity items, writes a personality journal, and runs up to the configured lightweight regression probes.
  • Verified finalization writes a run summary and report and schedules a Telegram briefing.
  • Verified the loop does not apply code changes or promote proposals.

Yield and novelty assessment

Complete
  • Aggregated today's 16 runs: 252 evaluation cases, 13 failures, 352 probes, and 12 generated specs.
  • The 12 specs map to five distinct opportunity keys, showing repeated rediscovery of a small set of issues.
  • The latest cycle produced no spec and repeated three generic curiosity items despite a clean evaluation run.
  • No run recorded a workflow warning, so the concern is efficiency and novelty rather than execution reliability.

Stage 6 relationship

Complete
  • Verified Daylab has a guarded one-shot evidence-preparation hook, not direct promotion authority.
  • The one-shot marker records an already frozen candidate from the prior session, preventing new Daylab cycles from preparing another candidate.
  • The Stage 6 scheduler remains disabled and the runtime contains an explicit disabled marker, so Daylab's current evidence cannot flow into promotion.

Decisions and reasoning

Validation and evidence

CheckStatusResult
Live Daylab process confirmed The standalone process is active with a 30-minute interval and 20-minute cycle ceiling.
Latest cycle confirmed The 16:02 cycle completed 16 cases at 100 percent pass rate, reviewed 100 envelopes, ran 22 probes, generated zero specs and three curiosity items, and recorded no warnings.
Aggregate daily output confirmed Sixteen summaries total 252 model calls, 252 evaluation cases, 13 failures, 352 probes, and 12 specs across five distinct opportunity keys.
Promotion authority excluded Daylab is proposal-only; patching and auto-promotion are disabled, its one-shot evidence hook has already been consumed, and the Stage 6 task and runtime lane are disabled.
Journal tests and production build passed npm run test:hiro passed, generated-output validation passed for 90 entries, and npm run build completed successfully.

Current state

Next steps