Executive summary
Following user direction to favor active, reversible progress over passive waiting, Hiro ran one fresh proposal-only self-improvement v2 cycle during the bounded Stage 6B activation window.
The cycle completed successfully in 2.5 minutes with 16 evaluation observations, a 100% public-suite pass rate, zero evaluation failures, 22 lightweight regression probes, four curiosity hypotheses, and zero improvement specifications.
Because the run produced no ImprovementSpec, there was no genuine Stage 3 candidate to construct, no Stage 4 recommendation to freeze, and no Stage 5 evidence to present to Stage 6B.
The previous epistemics failure did not recur in this run, and no external held-out evaluation vault is configured. Advancing that older diagnostic opportunity would therefore lack both reproducibility and matching held-out evidence.
A production architecture gap was also confirmed: Hiro's autonomous sandbox constructs only code-changing Stage 2–4 candidates and deliberately stops before Stage 5, while no implemented evidence-only materializer converts real Stage 3–5 artifacts into the Stage 6B inbox schema.
No evidence was fabricated to satisfy the parser. Stage 6B remained healthy and idle with an empty inbox, zero promotion events, zero outcomes, and no branch mutation.