Hiro development journal

First active Stage 6B candidate search

Cycle complete; no qualifying candidate produced Machine-readable JSON

Executive summary

Following user direction to favor active, reversible progress over passive waiting, Hiro ran one fresh proposal-only self-improvement v2 cycle during the bounded Stage 6B activation window.

The cycle completed successfully in 2.5 minutes with 16 evaluation observations, a 100% public-suite pass rate, zero evaluation failures, 22 lightweight regression probes, four curiosity hypotheses, and zero improvement specifications.

Because the run produced no ImprovementSpec, there was no genuine Stage 3 candidate to construct, no Stage 4 recommendation to freeze, and no Stage 5 evidence to present to Stage 6B.

The previous epistemics failure did not recur in this run, and no external held-out evaluation vault is configured. Advancing that older diagnostic opportunity would therefore lack both reproducibility and matching held-out evidence.

A production architecture gap was also confirmed: Hiro's autonomous sandbox constructs only code-changing Stage 2–4 candidates and deliberately stops before Stage 5, while no implemented evidence-only materializer converts real Stage 3–5 artifacts into the Stage 6B inbox schema.

No evidence was fabricated to satisfy the parser. Stage 6B remained healthy and idle with an empty inbox, zero promotion events, zero outcomes, and no branch mutation.

Work completed

Supported pipeline audit

Completed
  • Inspected the proposal-only v2 runner, cycle coordinator, Stage 3 candidate builder, Stage 4 candidate evaluator, Stage 5 isolated integrator, autonomous sandbox, and Stage 6B runner and packet validator.
  • Confirmed the autonomous sandbox requires code-changing specifications, external held-out evidence, and a clean repository, and always stops before Stage 5 integration.
  • Confirmed Stage 6B accepts only its distinct frozen evidence-candidate schema and scans a dedicated runtime inbox.
  • Repository search found validation and test fixtures for that schema but no production materializer that creates it from evidence-only Stage 3–5 output.

Fresh bounded self-improvement cycle

Completed successfully
  • Ran self-improvement v2 in proposal_only mode with a ten-minute maximum and a daylab evaluation label.
  • The public evaluation executed 16 observations and passed all of them.
  • The competence loop reviewed 100 recent response envelopes, including two blocked records, but produced no improvement specification.
  • The curiosity loop produced four hypotheses and the personality journal completed.
  • All 22 lightweight probes executed: 21 reported pass and one sports-resolver probe reported degraded rather than a hard failure.

Candidate admission decision

No candidate admitted
  • Did not reuse the older epistemics proposal because the fresh public cycle passed and did not reproduce its failure.
  • Did not claim matching held-out evidence because the required external vault is not configured.
  • Did not hand-author Stage 4 or Stage 5 success packets merely to satisfy Stage 6B's structural parser.
  • Left the Stage 6 inbox empty and allowed the runner to continue idling.

Stage 6B continuity

Healthy and idle
  • The bounded scheduler continued returning result code zero.
  • The candidate inbox contained zero JSON packets.
  • The append-only promotion ledger contained zero events and zero outcomes.
  • Hiro's Git worktree remained clean and its active revision remained unchanged.

Decisions and reasoning

Validation and evidence

CheckStatusResult
Bounded v2 process passed The proposal-only cycle completed in 2.5 minutes within its ten-minute limit and reported no internal errors.
Fresh public evaluation passed All 16 observations passed for a 100% pass rate with zero failures.
Lightweight regression probes completed All 22 probes ran; 21 passed and one sports-resolver probe was classified as degraded.
Improvement specification output no candidate The run produced zero ImprovementSpecs, so Stage 3 construction was not entered.
Held-out evidence availability unavailable No external held-out vault is configured for the autonomous sandbox path. No held-out success claim was made.
Stage 6B state passed The scheduler remained healthy, the inbox was empty, the ledger had zero events and outcomes, and no promotion occurred.

Current state

Next steps