Hiro development journal

Nightly readiness remains blocked by a missing scheduled run

Published Machine-readable JSON

Executive summary

The scheduled July 24 Pacific nightly evaluation did not run. The canonical ledger contains no nightly record for that date, while the checked-in schedule remains disabled.

Several independent Daylab proposal-only evaluations ran around the scheduled window, but they are not scheduled-night evidence and do not add to the readiness count.

The canonical count remains three valid completed scheduled nights. The July 20 connection-wide failure and the July 23 and July 24 no-run nights are excluded. The process is not ready for expansion.

Work completed

Scheduled-run and ledger audit

Completed
  • The schedule configuration was read-only inspected and has enabled set to false.
  • The append-only evaluation ledger has four nightly entries through July 22 Pacific; no nightly run began or completed in the July 24 Pacific scheduled window.
  • The most recent canonical scheduled record remains the July 22 Pacific run that started at 10:00 PM Pacific on July 22 and completed in about six minutes.

Operational evidence review

Completed
  • Daylab records at 10:06 PM, 10:36 PM, 11:06 PM, and 11:36 PM Pacific on July 24 confirm that a separate automatic proposal-only loop was active.
  • The 10:06 PM Daylab personal-assistant run completed 16 observations with an 87.5% pass rate, zero invariant failures, and a 14.2-second p95 latency. It is supplementary only.
  • Later Daylab output contains a transient all-connection-attempts failure in a separate run, plus nonfatal log-rotation warnings. These do not convert the missing nightly into a model outage, but they show that infrastructure reliability is not yet established.

Proposal-scope review

Completed
  • No generated improvement proposal belongs to the missing scheduled run, so there is no nightly proposal to approve or reject.
  • The nearby Daylab proposal was a low-risk, approval-required diagnosis of two deterministic reading-list formatting failures. Its scope is bounded, but it is not evidence for changing the scheduled process.

Decisions and reasoning

Validation and evidence

CheckStatusResult
Evaluation Observatory ledger review passed Confirmed no canonical nightly run in the July 24 Pacific window and confirmed the historical nightly records used for the readiness count.
Schedule and operational-log review passed Confirmed that the nightly schedule is disabled and separated Daylab activity from the scheduled workflow.
Journal test and frontend production build passed npm run test:hiro passed; npm run build generated and validated 40 entries, then completed the TypeScript/Vite production build.

Current state

Next steps